The Challenge
The medical device manufacturer needed reliable clean energy without capital expenditure, while maintaining uninterrupted production-grade power supply.
Our Solution
Enercore deployed a 500 kWp rooftop system under its OPEX model with safety infrastructure — hand railings, walkways, and lifelines — ensuring safe, long-term O&M access.
The Outcome
703,209 kWh estimated annual generation at 415V termination. Monthly PPA payments providing predictable long-term clean energy for the healthcare manufacturing facility.
Project Specifications
| Client Name | Hollister Medical India Ltd |
| Location | Bawal, Haryana, India |
| Capacity | 500 kWp |
| Estimated Generation | 703,209 kWh/year |
| Termination Voltage | Below the Shed at 415 V |
| Safety Considerations | Hand Railings, Walkways & Lifelines |
| Payment Structure | Monthly PPA |
Site Photos
Have a similar project in mind?
Let's design the right solution for your facility.

