The Challenge
The manufacturing client needed immediate electricity cost reduction without diverting capital from core production operations at their Bawal facility.
Our Solution
Enercore structured a fully-owned OPEX deployment with comprehensive safety infrastructure including hand railings, walkways, and lifelines for safe maintenance access across the rooftop.
The Outcome
703,209 kWh estimated annual generation. Termination voltage below the shed at 415V with monthly PPA payments providing predictable, long-term energy pricing.
Project Specifications
| Client Name | Caparo Maruti India Ltd |
| Location | Bawal, Haryana, India |
| Capacity | 507 kWp |
| Estimated Generation | 703,209 kWh/year |
| Termination Voltage | Below the Shed at 415 V |
| Safety Considerations | Hand Railings, Walkways & Lifelines |
| Payment Structure | Monthly PPA |
Site Photos
Have a similar project in mind?
Let's design the right solution for your facility.

